TM 5-2420-230-24-1
19-9. A/C RECEIVER-DRIER REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Equipment Conditions
Tools and Special Tools
TM or Para
Condition Description
FEL arms raised and
maintenance arm installed.
Materials/Parts
Hood raised.
Remove A/C pressure switch.
Drawings Required
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
a. Removal.
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive electrical
circuits, a direct short may result. Damage to equipment and injury or death to personnel may occur.
NOTE
Tag all hoses, wires, and tubes and note their positions before removal.
Cap and plug all tubes, hoses, and fittings upon removal.
Remove cable ties as necessary.
Ensure all hoses, wires, and tubes are disconnected and clear before removal.
(1)
Remove two hoses (1) from receiver-
drier (2). Inspect O-rings on hoses. Replace
any hose with a damaged O-ring.
(2)
Loosen hose clamp (3) and remove receiver-
drier (2) from bracket (4).
Change 1