TM 5-2420-230-24-1
(5)
Install air blower cover (8) on air blower (10) with three screws (9).
(6)
Install grommet (7) and cap (6) on fuel line (5) and air blower cover (8).
(7)
Install hose (3) on fuel line (5) and glow pin connection (4) with two cable ties (2).
(8)
c. Follow-On Maintenance.
(1)
(2)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Arctic heater removed.
Materials/Parts
Drawings Required
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer
Change 1