• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FLYWHEEL REPLACEMENT.
INJECTION PUMP REPLACEMENT.

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  26    27    28    29    30  31  32    33    34    35    36  
img
. . . . . . . . .
TM 5-2420-230-24-2
L-25. FLYWHEEL HOUSING REPLACEMENT.
This Task Covers:
a. Removal
b. Inspection
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para L-24
Flywheel removed.
Materials/Parts
Drawings Required
Coating, copper, Item 11, Appendix C
TM 5-2420-230-24P Figure 4
Grease, lithium, Item 34, Appendix C
Estimated Time to Complete
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
Refer to page L-112 for removal.
b. Inspection.
Refer to page L-472 for inspection.
c. Installation.
Adhesives, solvents, and sealing compounds burn easily and give off vapors that are harmful to the
skin and clothing. To avoid injury or death, keep away from open fire when using these materials, and
use only in well-ventilated areas. If adhesives, solvents, or sealing compounds contact the skin or
clothing, wash immediately with soap and water, and rinse thoroughly. Failure to comply may result
in injury or death to personnel.
Refer to page L-178 for installation.
d. Follow-On Maintenance.
Install flywheel (Para L-24).
END OF TASK
L-30
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.