• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Bosch RQV and RQV-K Governor
Fuel Pump Timing (005-037)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  904    905    906    907    908  909  910    911    912    913    914  
img
TM 5-2420-230-24-2
Fuel Pump Support Bracket (005-033)
B3.9 and B5.9 Series Engines
Page 5-60
Section 5 - Fuel System - Group 05
Fuel Pump Support Bracket (005-033)
Remove (005-033-002)
Rotary Pump
10 mm
Remove the capscrew that is connected to the pump and
the tail support bracket (2) first; then remove the capscrews
from the bracket (1) and block.
In-Line Pump
10 mm
Remove the capscrew that is connected to the pump and
the tail support bracket (2) first; then remove the capscrews
from the bracket (1) and block.
Install (005-033-026)
Rotary Pump
Install the tail support bracket finger-tight before final tight-
ening.
NOTE: Tighten bracket to block before tightening the
bracket to the pump.
10 mm
Tighten capscrew and bracket to the injection pump (2)
first; then the capscrews to the bracket and block (1).
Torque Value: 24 Nm
[18 ft-lb]
L-920


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.