TM 5-3805-280-24-1
Tests
SWING DYNAMIC BRAKING TEST
SPECIFICATIONS
50 5C (120 10F)
Oil Temperature
Engine Speed in Standard Mode
Fast Idle
Work Mode Selector Position
Dig Mode
E Mode Switch Position
Off
HP Mode Switch Position
Off
Auto-Idle Switch Position
Off
After 90 (1/4 turn) Swing,
45 (1/8 turn)
Upperstructure Must Stop After
Releasing Control Lever Within
Distance
SERVICE EQUIPMENT AND TOOLS
JT05800 Digital Thermometer
1. Install the temperature probe on the hydraulic
tank-to-pump suction line. (See JT05800 Digital
Thermometer Installation in this group.)
2. Heat hydraulic oil to the specified temperature. (See
Hydraulic System Warm-Up Procedure in this group.)
Oil--Specification
Temperature ........................................................... 50 5C (120 10F)
9025
25
57
CAUTION: Check that area is clear and large
enough to swing upperstructure with arm and
bucket extended. Machine must be on level
ground.
3. Turn upperstructure so boom is to the front
4. Extend the arm and bucket. Lower boom so bucket is
approximately 900 mm (3 ft) above the ground.
5. Operate machine at specifications.
Engine--Specification
Speed in Standard Mode ............................................................. Fast Idle
Work Mode Selector--Specification
Position ........................................................................................ Dig Mode
Continued on next page
CED,OUOE003,1075 1913AUG981/2
6-188