• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Cylinder Head - Assembly (2-13)
Section 3 - Rocker Levers - Group 03

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  279    280    281    282    283  284  285    286    287    288    289  
img
TM 5-2420-230-24-2
Cylinder Head - Assembly (2-13)
Cylinder Head - Group 2
Page 2-22
B Series Shop Manual
Install new valve collets and release the spring tension.
Plastic Hammer
Warning: Wear eye protection. If the collets are not cor-
rectly installed, they can fly out when the stems are hit
with a hammer.
After assembly, hit the valve stems with a plastic hammer
to make sure that the collets are seated.
L-285


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.