• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Flywheel Housing Inspection (16-03)
Front Support - Cleaning and Inspection (16-05)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  467    468    469    470    471  472  473    474    475    476    477  
img
TM 5-2420-230-24-2
Section 16 - Mounting Adaptations - Group 16
Flywheel Housing Assembly (16-04)
B Series Shop Manual
Page 16-5
Install the expanding plug in the barring tool hole.
Coat both sides of the inspection plate gasket with KW
Copper Coat .
13 mm
Install the inspection plate.
Tighten to 24 Nm [18 ft-lbs].
Wet Clutch Application
Perform all the steps in the procedure for dry clutch in-
stallation in addition to the following:
Coat the flywheel housing drain plug with pipe sealant
and install in the hole in the bottom of the flywheel hous-
ing.
Tighten the plug.
Refer to the pipe plug torque values in Section 10 for
different plug sizes.
L-473


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.