• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Normal Operation
MACHINE DRIVING PROCEDURES

Technical Manual For High Mobility Engineer Excavator Type I \(Nsn 2420-01-535-4061\)
Page Navigation
  141    142    143    144    145  146  147    148    149    150    151  
img
. . . . . . .
TM 5-2420-232-10
0005
PREPARING FOR ROAD TRAVEL
0005
1.
Reposition the service lights for road travel (WP 0004).
2.
Engage the backhoe boom lock (Figure 6, Item 1) and swing lock (Figure 6, Item 2) (WP 0004).
3.
Ensure the rear stabilizers (Figure 6, Item 3) are fully raised (WP 0004).
4.
Secure any additional equipment to be carried in the front bucket (Figure 6, Item 4).
435-A0321
Figure 6. Preparing for Road Travel
05
CAUTION
Travel struts are required for road travel to prevent damage to equipment.
5.
Fit the securing struts to the front bucket crowd ram (Figure 7, Item 5), front bucket arms (Figure 7, Item 6), and rear
bucket crowd ram (Figure 7, Item 7) (WP 0021). Connect the protrusion lamp (built into the rear securing strut).
6.
Select the correct suspension, steering, and drive modes for road travel:
a.
Select 2WS mode (WP 0004).
b.
Select 2WD mode (WP 0004).
c.
Select travel suspension mode (WP 0004).
435-A0321-1
Figure 7. Struts
05
END OF TASK
0005-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.