TM 5-2420-232-10
0007
STOWAGE INSTRUCTIONS FOR TOOLBOX LOCATED ON LEFT SIDE OF MACHINE
0007
1.
Working from left to right, position the red metal box, grease gun, and impact wrench in toolbox (Figure 2).
435-A1777
Figure 2. Toolbox Stowage
07
2.
Next position the chain saw sharpening kit, drift pin 3 lb ball peen hammer, and 6 lb deadblow hammer in toolbox (Figure
3).
435-A1778
Figure 3. Toolbox Stowage - Continued
07
0007-4