TM 5-3805-280-24-1
Tests
9. Do the Final Tracking Checks:
a. Propel machine forward on a flat area of naturally
compacted soil and then on a slope of naturally
compacted soil.
b. If machine mistracks to the left on the flat area, turn
the load adjusting cartridge (L) on the front pump
regulator out to slow the right track.
c. If the machine mistracks to the right under load on
the slope, turn the load adjusting screw (K) on the
rear pump regulator out to slow the left track.
d. If the machine mistracks to the left under load on
the slope, turn the load adjusting screw (K) on the
front pump regulator out to slow the right track.
9025
J--13 mm Nut
25
K--Load Adjusting Screw (Inner Spring)
116
L--Load Adjusting Cartridge (Outer Spring)
M--30 mm Nut
TX,9025,GG2661
1906MAY9714/14
6-247