TM 5-3805-281-24-1
Tests
5. Disconnect the drain line (A) from 90 elbow (D) at
return manifold (E). Put line in a calibrated container
(D). Install a cap (B) on the elbow.
6. Raise track off the ground for side being check.
7. Run machine at specifications.
Engine--Specification
Speed ........................................................................................... Fast Idle
Work Mode Selector--Specification
Position ........................................................................................ Dig Mode
E Mode Switch--Specification
Position .................................................................................................. Off
HP Mode Switch--Specification
Position .................................................................................................. Off
Auto-Idle Switch--Specification
Position .................................................................................................. Off
Propel Speed Switch--Specification
9025
Position ....................................................................... Slow Speed (Turtle)
25
142
8. For propel motor being checked, actuate propel
forward function at full speed for one minute. Record
amount of leakage. Repeat procedure for reverse.
A--Drain Line
B--JT03025 Cap
C--Calibrated Container
D--90 Elbow
E--Return Manifold
Continued on next page
CED,TX08227,3149
1930MAY983/5
6-289