TM 5-3805-281-24-2
16. Check pulley-to-hub for clearance in three equally
spread locations around hub using a feeler gauge.
Pulley-to-Hub--Specification
Clearance ............................................ 0.53--0.91 mm (0.021--0.036 in.)
17. Turn pulley one-half turn (180) and check clearance
in three equally spaced locations. Remove or install
shims as necessary for proper clearance.
18. Tighten clutch hub nut.
Clutch Hub Nut--Specification
Torque ............................................................................. 16 Nm (12 lb-ft)
T52,1830,J21 1923AUG936/6
MANIFOLDS
1. Recover the refrigerant from the system. (See
procedure in this group.)
IMPORTANT: Do not remove manifolds unless front
and rear head cap screws are installed
and tightened.
2. Remove cap screws using hex drive (A).
3. Inspect parting surfaces and O-rings.
4. Replace parts as necessary.
6. Evacuate and charge the system. (See procedures in
this group.)
A--Hex Drive
18
1830
33
CED,OUOE027,275
1929MAY981/1