• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLE AIR CONDITIONING COMPRESSOR - Continued
REMOVE AND INSTALL RECEIVER DRYER

Technical Manual For Hydraulic Excavator Model 330Lcr 2
Page Navigation
  632    633    634    635    636  637  638    639    640    641    642  
img
.
TM 5-3805-281-24-2
Heating and Air Conditioning
16. Check pulley-to-hub for clearance in three equally
spread locations around hub using a feeler gauge.
Pulley-to-Hub--Specification
Clearance ............................................ 0.53--0.91 mm (0.021--0.036 in.)
17. Turn pulley one-half turn (180) and check clearance
in three equally spaced locations. Remove or install
shims as necessary for proper clearance.
18. Tighten clutch hub nut.
Clutch Hub Nut--Specification
Torque ............................................................................. 16 Nm (12 lb-ft)
T52,1830,J21 1923AUG936/6
INSPECT AIR CONDITIONING COMPRESSOR
MANIFOLDS
1. Recover the refrigerant from the system. (See
procedure in this group.)
IMPORTANT: Do not remove manifolds unless front
and rear head cap screws are installed
and tightened.
2. Remove cap screws using hex drive (A).
3. Inspect parting surfaces and O-rings.
4. Replace parts as necessary.
5. Install manifolds.
6. Evacuate and charge the system. (See procedures in
this group.)
A--Hex Drive
18
1830
33
CED,OUOE027,275
1929MAY981/1
17-53


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.