• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section I. U.S. Army Supplement to Cummins Material.
STEAM CLEANING THE ENGINE.

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  1    2    3  4  5    6    7    8    9  
img
. . . . . .
TM 5-2420-230-24-2
L-3. ENGINE REPAIR.
This Task Covers:
a. Disassembly
b. Assembly
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para 4-10
Engine separated from
transmission.
Materials/Parts
None
Drawings Required
TM 5-2420-230-24P Figure 1
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
Refer to MAC in Appendix B
a. Disassembly.
Never crawl under equipment when performing maintenance unless equipment is securely blocked.
Equipment may fall and cause serious injury or death to personnel.
Refer to page L-97 for disassembly.
b. Assembly.
Refer to page L-130 for assembly.
c. Follow-On Maintenance.
Connect engine to transmission (Para 4-10).
END OF TASK
L-3
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.