• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Injection Pump Timing - Bosch VE - Continued
Back Leakage Valve - Replacement/Inspection (5-11)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  317    318    319    320    321  322  323    324    325    326    327  
img
TM 5-2420-230-24-2
Section 5 - Fuel System - Group 05
Injection Pump Repairs - Lucas CAV DPA (5-09)
B Series Shop Manual
Page 5-25
Remove the nut from the drive shaft by striking the wrench
with a sharp blow in a counterclockwise direction.
12 mm
Remove the dial indicator assembly and install the access
plug. Tighten to 8-10 Nm [6-7.5 ft. lb].
Injection Pump Repairs - Lucas CAV
DPA (5-09)
Locking Screw/O-Ring - Replacement (5-10)
Precisely mark the shaft position before removing the
locking screw.
15 mm
Remove the locking screw and washer.
L-323


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.