Engine Removal (000-001) - Continued
Throttle Control Lever Connection

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  656    657    658    659    660  661  662    663    664    665    666  
img
TM 5-2420-230-24-2
B3.9 and B5.9 Series Engines
Engine Installation (000-002)
Section 0 - Complete Engine - Group 00
Page 0-5
Engine Installation (000-002)
Install all the accessories and brackets that were removed
from the previous engine.
WARNING
The engine lifting equipment must be designed to lift
the engine and transmission safely as an assembly
without causing personal injury. The dry weight of the
standard 6BTA5.9 without accessories is 411 kg [905
lb]. Refer to the equipment manufacturer's specifica-
tions for the transmission weight.
NOTE: On applications where the rear-engine mounts are
attached to the transmission, it is often necessary to install
the engine and transmission as an assembly. Refer to the
OEM service manual.
Engine-Lifting Fixture, Part No. 3822512
Use a properly rated hoist and engine-lifting bracket, Part
No. 3822512, attached to the engine-mounted lifting brack-
ets to install the engine.
Align the engine in the chassis, and tighten the engine-
mounting capscrews. Refer to the equipment manufactur-
er's torque specifications.
Connect all engine- and chassis-mounted accessories that
were removed.
NOTE: Make sure that all lines, hoses, and tubes are prop-
erly routed and fastened to prevent damage. Make sure
that the air intake and exhaust pipe connections are tight
and free of leaks.
L-669