• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Engine Installation (000-002) - Continued
Engine Painting (000-007)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  659    660    661    662    663  664  665    666    667    668    669  
img
TM 5-2420-230-24-2
Engine Installation (000-002)
B3.9 and B5.9 Series Engines
Page 0-8
Section 0 - Complete Engine - Group 00
After pressure is observed, connect the wire to the fuel
solenoid.
Prime the low-pressure fuel system by opening the bleed
screw.
Operate the plunger on the fuel transfer pump until the fuel
flowing from the fitting is free of air.
Tighten the bleed screw.
Torque Value: 9 Nm
[80 in-lb]
WARNING
Do not remove the radiator cap from a hot engine. Hot
steam can cause serious personal injury. The engine
coolant temperature must be below 50C [122F].
Operate the engine at low idle for 2 to 3 minutes.
Shut off the engine, and wait 5 to 7 minutes for the lubri-
cating oil to drain to the lubricating oil pan, and check the
lubricating oil and coolant levels again.
Fill the engine to the correct lubricating oil and coolant
levels, if necessary.
L-672


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.