TM 5-2420-230-24-2
Engine Installation (000-002)
B3.9 and B5.9 Series Engines
Page 0-6
Section 0 - Complete Engine - Group 00
Throttle Control Lever Connection
Install and adjust the throttle linkage to the injection pump
control lever. Refer to the OEM service manual.
Adjust the length of the cable/rod to the mechanical shut-
down lever so there is stop-to-stop movement. Refer to the
OEM service manual.
Fill the engine with clean lubricating engine oil.
NOTE: The total oil system capacity, including lubricating
oil filters, is as follows:
Liters
Qt
Four-Cylinder
11.0
11.6
Six-Cylinder
16.4
17.3
Optional Six-
12.6
13.3
Cylinder
Optional Six-
18.9
20.0
Cylinder (Ford)
Fill the cooling system with a premixture of 50-percent
water, 50-percent ethylene glycol-based antifreeze, and
DCA4 corrosion protection. Refer to Procedure 008-018.
NOTE: The total coolant capacity (engine only) is as fol-
lows:
Liters
Qt
Four-Cylinder
7
7.4
Four-Cylinder (Water
9.7
10.3
Aftercooled)
Six-Cylinder
10.5
11.1
Six-Cylinder (Water
14.5
15.3
Aftercooled)
L-670