TM 5-3805-280-10
Transporting
4. Lower the boom.
Before leaving the operator's seat, perform steps 1--9.
If machine cannot be transported with arm fully
1. Position machine on trailer so that dimension (A) is
retracted, remove bucket or attachment and retract
1372 mm (54 in.).
arm.
2. Extend bucket cylinder fully.
5. Lower bucket onto blocks.
3. Extend arm cylinder fully.
Continued on next page
TX,40,DH5642
1926MAR972/3
8-4