• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 23. STORAGE
PREPARE MACHINE FOR STORAGE - Continued

Operator Manual For Hydraulic Excavator Model 230Lcr And Model 230Lcrd With Rock Drill
Page Navigation
  343    344    345    346    347  348  349    350    351    352    353  
img
TM 5-3805-280-10
Storage
PREPARE MACHINE FOR STORAGE
1. Repair worn or damaged parts. Install new parts, if
necessary, to avoid needless delays later.
2. Clean primary air cleaner.
TX,105,FF2313
1903APR911/3
IMPORTANT: High pressure washing [greater than
1379 kPa (13.8 bar) (200 psi)] can
damage freshly painted finishes. Paint
should be allowed to air dry for 30 days
minimum after receipt of machine
before cleaning parts or machines with
high pressure. Use low pressure wash
operations until 30 days have elapsed.
3. Wash the machine. [Use low pressure wash operations
(less than 1379 kPa (13.8 bar) (200 psi) until 30 days
after receipt of machine have elapsed.] Paint areas to
prevent rust. Replace decals, where needed.
4. Apply waste oil to track chains. Run machine back and
forth several times. Park machine on a hard surface to
prevent tracks from freezing to ground.
5. Store machine in a dry, protected place. If stored
outside, cover with a waterproof material.
Continued on next page
TX,105,FF2313
1903APR912/3
23-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.