• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STARTING CIRCUIT DIAGNOSTIC PROCEDURES - CONTINUED
STARTING CIRCUIT DIAGNOSTIC PROCEDURES - CONTINUED

Maintenance Manual For Hydraulic Excavator Model 230Lcr
Page Navigation
  215    216    217    218    219  220  221    222    223    224    225  
img
TM 5-3805-280-24-1
Sub-System Diagnostics
STARTER PROTECTION
1--24 Volt Terminal
YES: Relay is OK.
RELAY (K11) CHECK
2--Ground Terminal
3--Relay Common
NO: Relay has failed.
4--Relay Normally Closed
Replace.
5--Relay Normally Open
Disconnect harness from starter protection relay.
Connect ohmmeter to terminals 3 and 4.
T7447BG
1914JAN91
Does ohmmeter read continuity?
Connect 24 volts to relay terminal 1 and ground terminal
2.
Does relay "click"?
Connect ohmmeter to terminals 3 and 5.
9015
Does ohmmeter read continuity?
15
20
1/1
YES: Solenoid is OK.
FUEL SHUTOFF
SOLENOID (Y7) CHECK
NO: Solenoid has failed.
Replace.
T118387 UN21NOV98
Disconnect harness from fuel shutoff solenoid.
Connect 24 volts to solenoid terminals 1 and 2, and ground terminal 3, then remove
power from terminal 2.
Does solenoid "click" and pull injection pump shutoff lever back, and remain in the
energized position after power is removed from terminal 2?
1/1
4-85


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.