• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SWING MOTOR START-UP PROCEDURE
PROPEL MOTOR START-UP PROCEDURE

Maintenance Manual For Hydraulic Excavator Model 230Lcr
Page Navigation
  480    481    482    483    484  485  486    487    488    489    490  
img
TM 5-3805-280-24-1
Tests
SWING GEARBOX START-UP PROCEDURE
IMPORTANT: Swing gearbox will be damaged if not
filled with oil before operating swing
function. Procedure must be performed
whenever a new swing gearbox is
installed or oil has been drained from
the gearbox.
1. Check that drain line (A) plug is installed.
2. Remove fill cap (B). Add oil. (See Swing Gearbox,
Propel Gearbox and Pump Gearbox Oils in Group
9000-04.)
3. Install fill cap. Check oil level on dipstick.
9025
A--Swing Gearbox Drain Line
25
B--Fill Cap
33
TX,25,GG2228
1913AUG981/1
6-163


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.