• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COLD START ADVANCE SYSTEM OPERATION (ROTARY PUMPS)
COLD START ADVANCE SYSTEM OPERATIONAL CHECK (ROTARY PUMPS)

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  569    570    571    572    573  574  575    576    577    578    579  
img
TM 5-3805-280-24-2
Fuel System Operation and Tests
COLD START SWITCH OPERATIONAL
115
47
CHECK (ROTARY PUMPS)
The cold start switch (B) is an option available on rotary
injection pumps.
1. Disconnect cold start switch connector (A) from pump
wiring harness.
2. Remove cold start switch from thermostat
housing/water manifold.
3. Submerge switch in water at 60 C (140 F) for a few
A--Connector
minutes.
B--Cold Start Switch
4. Check for open or closed switch. On Lucas pumps, the
switch should be closed. On Stanadyne pumps, the
switch should be open.
5. Replace switch if defective.
6. Install switch in thermostat housing/water manifold and
tighten to specifications.
Cold Start Switch--Specification
Torque .............................................................. 5 Nm (3.5 lb-ft) (42 lb-in.)
7. Connect cold start switch connector to pump wiring
harness.
RG,115,JW7700 1924NOV971/1
13-574


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.