• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVE AND INSTALL TOOTH SHANK
REMOVE AND INSTALL TOOTH SHANK - Continued

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  863    864    865    866    867  868  869    870    871    872    873  
img
TM 5-3805-280-24-2
Buckets
5. Install shank into corner so it is tight against the
IMPORTANT: Good welds are important. Have only
bevel edge and side of bucket.
a qualified welder do the welding.
Before welding, clean all dirt and
Install center shanks so they are tight against bevel
paint from weld area. Connect the
33
edge and spaced equally across width of bucket.
welder ground clamp as close to
3302
each weld area as possible so
6
6. Tack weld at the top rear center to hold it in
electrical current does not pass
position.
through any bearings or bushings.
4. Before welding shank, remove the tooth tip so
rubber pin lock is not damaged by the heat.
Continued on next page
TX,33,GG2396 1921SEP983/5
21-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.