• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVE AND INSTALL PILOT SHUT-OFF VALVE
DISASSEMBLE AND ASSEMBLE PILOT SHUT-OFF VALVE

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  955    956    957    958    959  960  961    962    963    964    965  
img
TM 5-3805-280-24-2
Hydraulic System
PILOT SHUT-OFF VALVE LINKAGE ADJUSTMENT
A--Pilot Shut-Off Lever
C--Valve
E--Cap Screw
B--Rod
D--Lever
1. Stop engine.
5. Pull pilot shut-off lever to the OFF position. Check
that lever is against the rear stop.
2. Remove cover underneath operator's station.
CAUTION: Machine may move if adjustment
3. Push pilot shut-off lever (A) forward to the ON
is incorrect. Before checking pilot shut-off
position. Check that lever is against the front stop.
lever adjustment, make sure the area around
machine is clear.
4. Adjust ball joints on rod (B) to get the specified
clearance between valve lever (D) and head of cap
6. Start the engine. Run engine at slow idle. Actuate
screw (E).
the hydraulic functions. Hydraulic functions must not
move with the pilot shut-off lever in the OFF
Linkage Adjustment--Specification
33
position. If hydraulic functions move, repeat
3360
Clearance............................................. 1.5 0.5 mm (0.06 0.02 in.)
adjustment procedure.
60
between lever and cap screw
TX,33,UU3790
1921SEP981/1
21-98


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.