• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL UPPERSTRUCTURE - Continued
REMOVE AND INSTALL SWING BEARING

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  1101    1102    1103    1104    1105  1106  1107    1108    1109    1110    1111  
img
TM 5-3805-280-24-2
Mechanical Drive Elements
A--DFT1089 Barrel
C--Hardwood Block (Use
Support (2 used)
as Required)
B--3.7 m (12 ft) Length of
W8 x 28 lb Wide Flange
Beam
15. Lower machine so lower track rollers and front
11. Raise machine just enough to remove the
idler are on the track chain.
hardwood blocks (C), wide flange beam (B), and
barrel supports (A).
16. Tighten any of the swing bearing-to-main frame
cap screws that could not be tightened.
12. Lower machine so lower track rollers and front
idler are on track chain.
17. Install track chains.
13. Remove bridge planks and barrel supports from
18. Adjust track sag. (See Adjust Track Sag
other side.
Procedure in Group 0130.)
14. Turn upperstructure to other side and raise
machine just enough to remove hardwood blocks
between roller and track chain.
43
4350
28
TX,43,UU3744
1923SEP984/4
22-27


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.