• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSPECTION HYDRAULIC DRIFTER - Continued
DISASSEMBLE AND ASSEMBLE GCX 14/12 FEED

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  1203    1204    1205    1206    1207  1208  1209    1210    1211    1212    1213  
img
TM 5-3805-280-24-2
Rock Drill
44
9506
135. Install inflation tool, 95233 of accumulator nitrogen
78
inflation kit, 95234 on cover (A).
136. Ensure key (B) is engaged on inflating screw head
on cover (A).
137. Tighten fixing screws.
138. Fully tighten setting screw (C).
139. Turn drain cock (D) off.
140. Connect the flange to the nitrogen bottle pressure
A--Cover
reducer, 41544.
B--Key
C--Setting Screw
141. Open nitrogen bottle, 48429 and set pressure
D--Drain Cock
reducer, 41544 to the required pressure: 4 bar for
LP accumulator; 40 bar for HP accumulators.
142. Fill up accumulator by loosening key (A).
143. Tighten key (A) after pressure is stabilized.
144. Close nitrogen bottle, 48429 and turn drain cock (D)
to off to relieve pressure from inflation tool, 95233.
145. Remove inflation tool, 95233.
146. Tighten inflating screw in cover (A) with spanner,
66223.
Inflating Screw--Specification
Torque ............................................................................. 22 Nm (16 ft-lb)
CED,OUOE019,9 1912MAR9934/34
23-73


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.