TM 5-3805-280-24-2
Rock Drill
44
9506
161
1--Hose (10 used)
4--Solenoid (3 used)
8--Tee
12--Adapter (2 used)
2--Solenoid Connector (3
5--Screw (4 used)
9--Adapter (6 used)
used)
6--Solenoid Valve
10--Pressure Socket
3--Screw (3 used)
7--Tee
11--Tee
190. Install three solenoid connectors (2).
187. Install two adapters (12), tee (11), pressure
socket (10), six adapters (9), and tees (7 and 8).
191. Install ten hoses (1).
188. Install solenoid valve (6) and four bolts (5).
189. Install three solenoids (4) and three screws (3).
Continued on next page
CED,OUOE019,18 1901APR9940/49
23-150