• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
JT05801 CLAMP-ON ELECTRONIC TACHOMETER INSTALLATION - Continued
ENGINE SPEED CHECK

Technical Manual For Hydraulic Excavator Model 330Lcr 1
Page Navigation
  121    122    123    124    125  126  127    128    129    130    131  
img
TM 5-3805-281-24-1
Adjustments
IMPORTANT: Failure to have the shut-off lever tight
against run position stop (upper stop)
can result in low engine horsepower.
9. Turn the key switch to ON.
Push plunger into solenoid housing so hold coil holds
the plunger in the run position.
Check that shut-off lever is tight against run position
stop using a 0.025 mm (0.001 in.) feeler gauge. If
9010
20
feeler gauge passes between shut-off lever and stop,
3
shorten the linkage two more turns.
10. Turn key switch to OFF.
The spring inside the solenoid housing boot will
extend the plunger to push the shut-off lever down to
the stop position stop (lower stop ) (G).
Check that shut-off lever is within the specified
distance of stop position stop.
Fuel Shut-Off Lever-to-Stop Position Stop--Specification
Distance..................................................... within 3 mm (0.125 in.) of stop
position stop
TX,05,GG2305 1908JUN983/3
3-43


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.