TM 5-3805-281-24-2
Fuel System
9. Tighten injection nozzle gland nut to 88 Nm (65 lb-ft).
Keep handle (A) pointing straight out while tightening.
Socket window (B) is cut deep enough to obtain a new
"bite" without removing inner socket.
10. Be sure O-ring is positioned against injection nozzle
gland nut.
Torquing Nozzle Gland Nut
RG,RG34710,1318
1923OCT974/7
11. Install leak-off connectors (A) with O-rings on injection
nozzles. Tighten securely.
Installing Nozzle Leak-off Connectors
Continued on next page
RG,RG34710,1318
1923OCT975/7
11-408