• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES FOR HYDRAULIC EXCAVATOR 330LCR - Continued
APPENDIX B. MAINTENANCE ALLOCATION CHART FOR HYDRAULIC EXCAVATOR 330LCR

Technical Manual For Hydraulic Excavator Model 330Lcr 2
Page Navigation
  1030    1031    1032    1033    1034  1035  1036    1037    1038    1039    1040  
img
TM 5-3805-281-24-2
UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES
FOR HYDRAULIC EXCAVATOR 330LCR
ITEM
INTERVAL
ITEM TO BE INSPECTED
EQUIPMENT IS NOT
NO.
PROCEDURE: DO THE PMCS AND HAVE ITEM
READY/AVAILABLE
REPAIRED, FILLED, OR ADJUSTED AS NEEDED
IF:
43
Annually
Adjust Engine Speed Control Cable
NOTE: The ball joints (D) are installed on the
cable to full thread engagement. A ball joint
can be used to lengthen a cable end, if needed,
but must have at least 6 mm (1/4 in.) of thread
engagement to avoid stripping the threads on
cable end.
(1) Install ball joints (D) to full thread engagement.
Tighten nuts.
(2) Install speed control cable (F) in brackets (E
and H). Tighten nuts so threaded portions of
cable are centered in brackets. As needed,
adjust cable in brackets to connect ball joint to
lever or arm.
(3) Connect ball joint to the outer hole of engine
control motor arm (I).
(4) Do engine control motor adjustment and then
the engine speed learning procedure.
44
Every 3 Years
Replace Seat Belt
(1) Replace the complete seat belt assembly
regardless of appearance. A date label, to
determine the age of the belt, is attached to
each belt.
A-37


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.