TM 5-3805-294-10
OPERATOR MAINTENANCE
OPERATING TECHNIQUES
INITIAL SETUP:
Equipment Condition
NOTE
Operating on a firm, level surface optimizes machine stability.
1.
Create a level worksite by counter-rotating the tracks 30 degrees to each side to compact the surface material.
HYEX01483
2.
If necessary, use bucket to add or remove material to level the worksite.
HYEX01484
Figure 2.
Add or Remove Material.
3.
If material is added, drive over new material to compact it until the worksite feels stable.
END OF TASK