TM 5-2420-230-24-1
c. Follow-On Maintenance.
(1)
(2)
(3)
(4)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
"Do Not Operate" tag attached
to ignition switch.
Personnel Required
Drawings Required
MOS 62B, Construction Equipment Repairer
References
Estimated Time to Complete Task
None
a. Removal.
NOTE
Tag all wires and note their positions before removal.
Remove cable ties as necessary.
Ensure all wires are disconnected and cleared before removal.
To gain access to cables, some components may need to be removed.
Change 1