Prior to performing any maintenance on the Interim High-Mobility Engineer Excavator (IHMEE), perform the following
procedure:
(1)
Ensure vehicle is positioned on level ground.
(2)
(3)
Raise Front-End Loader (FEL), install maintenance arm, and lower FEL onto maintenance arm, as required
(4)
(5)
(6)
Upon completion of maintenance activities, restore power and return vehicle to operational readiness using the following
procedure:
(1)
(2)
(3)
(4)
(5)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position, as required
(6)
Complete necessary documents and return IHMEE to relevant authority.