12-1. GENERAL.
This chapter contains routine maintenance activities and removal and installation procedures for the electrical system of the
Interim High-Mobility Engineer Excavator (IHMEE) vehicle.
12-2. VEHICLE PREPARATION AND ISOLATION.
Prior to commencement of maintenance functions on the IHMEE, complete steps in the following procedure:
(1)
Ensure vehicle is positioned on level ground.
(2)
Ensure parking brake is applied (TM 5-2420-230-10).
(3)
Raise FEL, install maintenance arm, and lower FEL onto maintenance arm, as required (TM 5-2420-230-10).
(4)
Shut OFF engine (TM 5-2420-230-10).
(5)
Place electrical master switch in OFF position (TM 5-2420-230-10).
(6)
Attach "Do Not Operate" tag to ignition switch (TM 5-2420-230-10).
12-3. RESTORE IHMEE TO OPERATIONAL READINESS.
Upon completion of maintenance activities, restore power and return vehicle to operational readiness using the following
procedure:
(1)
Place electrical master switch in ON position (TM 5-2420-230-10).
(2)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
(3)
Ensure parking brake is applied (TM 5-2420-230-10).
(4)
Start engine (TM 5-2420-230-10).
(5)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position as required
(TM 5-2420-230-10).
(6)
Complete necessary documents and return IHMEE to relevant authority.