RESTORE IHMEE TO OPERATIONAL READINESS.
MUFFLER REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  397    398    399    400    401  402  403    404    405    406    407  
img
. . . . . . . . .
TM 5-2420-230-24-1
b. Installation.
Steps in installation of muffler heat shield are the reverse of those in removal procedure.
c. Follow-On Maintenance.
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
END OF TASK
11-5. MUFFLER REPLACEMENT.
This Task Covers:
a. Removal
c. Inspection
d. Installation
b. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Para 11-4
Muffler heat shield removed.
Para 11-6
Exhaust pipe removed.
Tools and Special Tools
Tool kit, general mechanics, Item 38, Appendix B
Drawings Required
TM 5-2420-230-24P Figure 31
Materials/Parts
Sealant, metal, Item 54, Appendix C
Estimated Time to Complete
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
References
None
a. Removal.
Hot parts can burn personnel. Let hot parts cool before starting work.
(1)
Remove mounting bolts securing top and bottom of muffler.
(2)
Loosen clamp securing muffler to exhaust pipe.
(3)
Remove muffler.
Change 1
11-3