Upon completion of maintenance activities, restore power and return vehicle to operational readiness:
(1)
(2)
(3)
(4)
(5)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position, as required
(6)
Complete necessary documents and return IHMEE to relevant authority.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
"Do Not Operate" tag attached
to ignition switch.
Personnel Required
MOS 62B, Construction Equipment Repairer
Drawings Required
References
None
Estimated Time to Complete
a. Removal.
Hot parts can burn personnel. Let hot parts cool before starting work.
(1)
Remove six bolts, washers, and self-locking nuts securing heat shield. Discard self-locking nuts.
(2)
Remove heat shield.