• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Aftercooler
Air Crossover - Continued

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  1122    1123    1124    1125    1126  1127  1128    1129    1130    1131    1132  
img
TM 5-2420-230-24-2
Air Crossover (010-019)
B3.9 and B5.9 Series Engines
Page 10-16
Section 10 - Air Intake System - Group 10
Install (010-001-026)
10 mm
NOTE: The holes shown in the illustration are drilled
through. Apply liquid teflon sealant to the capscrews.
Install the aftercooler housing and a new gasket.
Torque Value: 24 Nm
[18 ft-lb]
8 mm
Install the coolant supply tube (1) and coolant return tube
(2). Install the air crossover tube (3).
Torque Value: 8 Nm
[71 in-lb]
Fill (010-001-028)
CAUTION
During filling, air must be vented from the engine cool-
ing passages. Open the engine vent petcock. Make sure
to open the petcock on the aftercooler, for aftercooled
engines. The system must be filled slowly to prevent air
locks. Wait 2 to 3 minutes to allow air to be vented, then
add coolant to bring the level to the bottom of the
radiator filler neck. Failure to do so will cause entrap-
ment of air in cooling system and will cause engine to
overheat.
Fill the coolant system with a premixture of 50-percent
water and 50-percent ethylene-glycol-type antifreeze.
Air Crossover (010-019)
Remove (010-019-002)
8 mm or Screwdriver
Loosen the hose clamps, and position the hose so the
crossover tube can be removed.
L-1140


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.