TM 5-2420-232-10
0006
COLD START PROCEDURES FOR +32 TO -26F (0 TO -32C)
AND -26 TO -40F (-32 TO -40C) -- CONTINUED
Start Procedure: -26 to -40F (-32 to -40C) - Continued
0006
435-A0331
Figure 7. Cold Start Valves - Position B
06
7.
Using the loader bucket service, blow relief pressure for 10 sec. on and 5 sec. off for the next 8 minutes. Then SLOWLY
close cold start valve number 2 (Figure 8, Item 4) to position C.
435-A0319
Figure 8. Cold Start Valve - Position C
06
8.
Continue to blow relief pressure on the loader bucket crowd service 10 sec. on 5 sec. off for the next 5 minutes.
9.
Then proceed with the -40F (-40C) warm up procedure
Change 1
0006-10