• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 4. Weekly/Annually PMCS - Continued.
Table 5. Lubrication Instructions.

Technical Manual For High Mobility Engineer Excavator Type I \(Nsn 2420-01-535-4061\)
Page Navigation
  241    242    243    244    245  246  247    248    249    250    251  
img
TM 5-2420-232-10
0017
Table 4. Weekly/Annually PMCS - Continued.
LOCATION
ITEM TO
ITEM
NOT FULLY MISSION
CHECK/
MAN-
NO.
CAPABLE IF
PROCEDURE
SERVICE
INVERVAL HOURS
AAL
a. Check for loose or missing bolts.
Parts are loose or missing.
14
Weekly
Pavement
Breaker
b. Inspect hoses and fittings for leaks or Damage or leaks are evident.
(Rock Drill)
damage.
c. Inspect bit for damage.
Damage is evident.
d. Ensure enough grease is being used.
e. Store off of ground on cribbing, if
possible.
a. Prime and paint all exposed metal
Metal is corroded through.
15
Annually
Sandbagger
surfaces.
b. Store off of ground on cribbing, if
possible.
a. Prime and paint all exposed metal
Metal is corroded through.
16
Annually
Snow Plow
surfaces.
b. Store plow off of ground on cribbing,
if possible.
END OF TASK
Change 1
0017-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.