• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 3. After PMCS - Continued.
Table 4. Weekly/Annually PMCS.

Technical Manual For High Mobility Engineer Excavator Type I \(Nsn 2420-01-535-4061\)
Page Navigation
  236    237    238    239    240  241  242    243    244    245    246  
img
TM 5-2420-232-10
0017
Table 3. After PMCS - Continued.
LOCATION
ITEM TO
ITEM
NOT FULLY MISSION
CHECK/
MAN-
NO.
CAPABLE IF
PROCEDURE
SERVICE
INVERVAL HOURS
a. Check for loose and missing bolts.
Parts are loose or missing.
27
After
Pavement
Breaker
b. Inspect hoses and fittings for leaks
Damage or leaks are evident.
(Rock Drill)
and damage.
c. Inspect bit for damage.
Damage is evident.
a. Check for loose and missing bolts.
Parts are loose or missing.
28
After
Compactor
b. Inspect hoses and fittings for leaks
Damage or leaks are evident.
and damage.
c. Inspect foot plate for damage.
Damage is evident.
a. Check for loose and missing bolts.
Parts are loose or missing.
29
After
Sandbagger
b. Inspect hoses and fittings for leaks
Damage or leaks are evident.
and damage.
a. Check for loose and missing bolts.
Parts are loose or missing.
30
After
Snow Plow
b. Inspect hoses and fittings for leaks
Damage or leaks are evident.
and damage.
c. Check if cutting edge is worn within
Cutting edge is excessively worn.
1/2 to 3/8 in. (1.27 to 0.95 cm) of
moldboard.
d. Check if skid shoes have a 1/4 in.
Skid shoes are excessively worn.
(0.64 cm) average thickness.
e. Lubricate with grease.
END OF TASK
0017-21
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.