EQUIPMENT PROTECTION AND CARE
Figure 3. Pavement Breaker Engagement

Technical Manual For High Mobility Engineer Excavator Type I \(Nsn 2420-01-535-4061\)
Page Navigation
  435    436    437    438    439  440  441    442    443    444    445  
img
.
TM 5-2420-232-10
0051
PREPARATION FOR PAVEMENT BREAKER OPERATION CONTINUED
4.
Insert two tool keepers (Figure 1, Item 2) in pavement breaker (Figure 1, Item 1).
5.
Insert tool keeper locking pin (Figure 1, Item 4) in pavement breaker (Figure 1, Item 1).
Figure 1. Pavement Breaker Tool Change
051
6.
After installing pavement breaker to machine (WP 0004), connect pavement breaker hoses to auxiliary connections (Fig-
ure 2, Item 1) on dipper (Figure 2, Item 2).
Figure 2. Pavement Breaker Hose Connection
051
0051-3