• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CLEAN CYLINDER LINERS
VISUALLY INSPECT CYLINDER LINERS - Continued

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  133    134    135    136    137  138  139    140    141    142    143  
img
TM 5-3805-280-24-2
Cylinder Block, Liners, Pistons and Rods
VISUALLY INSPECT CYLINDER LINERS
10
24
IMPORTANT: If liner pitting has occurred, check
condition of coolant.
NOTE: When installing reusable liners, rotate 90 from
original position. The liners should be deglazed
and ring sets installed in pistons.
1. Inspect exterior length of liner for pitting (A). Check
packing step for erosion (B). If pitting or erosion is
observed, measure depth of pits with a fine wire or
needle. Replace piston and liner if:
Depth of any pit is one-half or more of liner thickness
(C).
Depth of erosion is one-half or more of the packing
step (D).
Cylinder Liner--Specification
Thickness....................................................................... 5.875--6.375 mm
(0.2313--0.2510 in.)
Cylinder Liner Packing Step--Specification
Dimension.................................................................. 2.0185--2.2865 mm
(0.07947--0.09002 in.)
A--Liner Pitting
B--Liner Erosion
C--Liner Thickness
D--Packing Step
Continued on next page
RG,10,DT7415 1912NOV971/2
13-137


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.