• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL FRONT CRANKSHAFT OIL SEAL
Lubrication System

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  289    290    291    292    293  294  295    296    297    298    299  
img
TM 5-3805-280-24-2
Camshaft, Balancer Shafts and Timing Gear Train
COMPLETE FINAL ASSEMBLY
16
61
5. Install fan. (Group 25)
1. Install fuel supply pump. (Group 35)
6. Install alternator. (Group 04)
2. Remove cam follower holding tools (if used for
camshaft removal).
7. Fill engine crankcase with clean oil having correct
viscosity and grade specifications. (Group 02)
3. Install push rods and rocker arm assembly. (Group
05)
8. Perform engine break-in as outlined in Group 05.
4. Adjust valve clearance and install rocker arm cover
and sealing ring. (Group 05)
RG,16,DT7469 1914NOV971/1
13-293


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.