• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUEL SHUT-OFF SOLENOID RESISTANCE TEST (LUCAS PUMP)
FINAL FUEL FILTER/WATER SEPARATOR OPERATION

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  576    577    578    579    580  581  582    583    584    585    586  
img
TM 5-3805-280-24-2
Fuel System Operation and Tests
FUEL SHUT-OFF SOLENOID LINKAGE
115
54
ADJUSTMENT (IN-LINE INJECTION PUMPS)
Shut-off solenoid linkage is factory adjusted and usually
will not require additional field adjustment. ALWAYS check
linkage and lever for alignment and binding before making
adjustments.
1. Thoroughly lubricate all linkage and lever pivot points.
2. If necessary, adjust linkage (A) so that lever (B)
contacts stop (C) with key switch "OFF" and engine not
running.
3. Start engine and run at slow idle. Lever should contact
stop (D) or nearly contact when the lever is being
pushed up.
A--Link
B--Lever
C--Stop
D--Stop
RG,115,JW7697
1924NOV971/1
13-581


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.