TM 5-3805-281-24-1
Tests
10. Do the Final Tracking Checks:
a. Propel machine forward on a flat area of naturally
compacted soil and then on a slope of naturally
compacted soil.
b. For a mistrack to the left on the flat area, turn load
adjusting cartridge (I) on the front pump regulator
out to slow the right track.
c. For a mistrack to the right on the flat area, turn
load adjusting cartridge (I) on the rear pump
regulator out to slow the left track.
d. For a mistrack to the right under load on the slope,
turn the load adjusting screw (H) on the rear pump
regulator out to slow the left track.
e. For a mistracks to the left under load on the slope,
turn the load adjusting screw (H) on the front
pump regulator out to slow the right track.
9025
25
121
G--13 mm Nut
H--Load Adjusting Screw (Inner Spring) (Engine
Pulldown at High Pressure)
I--Load Adjusting Cartridge (Outer Spring)
(Engine Pulldown at Medium Pressure)
J--30 mm Nut
CED,TX08227,3143 1928MAY9813/13
6-268