• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLE FRONT IDLER
TEST FRONT IDLER FOR OIL LEAKAGE

Technical Manual For Hydraulic Excavator Model 330Lcr 1
Page Navigation
  733    734    735    736    737  738  739    740    741    742    743  
img
TM 5-3805-281-24-1
Track System
NOTE: Apply equal pressure with fingers at four
12. Fill front idler with 225 mL (7.6 fl oz) of oil. (See
equally spaced points on seal face. Seal must
Track Roller, Front Idler, and Carrier Roller Oil in
"pop" down into place so O-ring is tight against
Fuels and Lubricants, Group 0004.)
seal bore. A volatile non-petroleum base
solvent or talcum powder may be used as a
13. Clean threads of drain plug (D) using cure primer.
01
lubricant. Solvent MUST NOT damage the
Apply pipe sealant and install plug.
0130
O-rings or leave a oil residue.
40
14. Install yoke (I). Tighten cap screws (J).
9. Wipe finger prints and foreign material off seal ring
Yoke-to-Bracket Cap Screw--Specification
face using clean oil and lint-free tissues. Apply a
thin film of oil to each seal ring face.
Torque................................................................... 206 Nm (152 lb-ft)
10. Install axle (H) into idler (C).
11. Repeat procedure for other side of idler.
CED,OUOE023,137
1926MAY982/2
9-40


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.