• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 9 COOLING SYSTEM
COOLING SYSTEM SERVICING.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  293    294    295    296    297  298  299    300    301    302    303  
img
. . . . . . . . . . . . . . . . . .
TM 5-2420-230-24-1
9-3. RESTORE IHMEE TO OPERATIONAL READINESS.
Upon completion of maintenance activities, restore power and return vehicle to operational readiness using the following
procedure:
(1)
Place electrical master switch in ON position.
(2)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
(3)
Ensure parking brake is applied (TM 5-2420-230-10).
(4)
Start engine (TM 5-2420-230-10).
(5)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position, as required
(TM 5-2420-230-10).
(6)
Complete necessary documents and return IHMEE to relevant authority.
9-4. COOLING SYSTEM SERVICING.
This Task Covers:
a. Draining
b. Filling
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
TM 5-2420-230-10
Vehicle positioned on level
ground.
Tools and Special Tools
Pan, drain, Item 29, Appendix B
TM 5-2420-230-10
Parking brake applied.
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Engine shut OFF.
TM 5-2420-230-10
Electrical master switch OFF.
TM 5-2420-230-10
"Do Not Operate" tag attached
Materials/Parts
Antifreeze, Item 3, Appendix C
to ignition switch.
Cloth, lint-free, Item 10, Appendix C
TM 5-2420-230-10
Hood raised.
Personnel Required
Drawings Required
MOS 62B, Construction Equipment Repairer
None
References
Estimated Time to Complete Task
TM 750-254
Refer to MAC in Appendix B
TB 750-651
9-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.