TM 5-2420-230-24-1
(5)
Replace coolant reservoir pressure cap to first notch.
(6)
(7)
(8)
Inspect coolant level. If necessary, add coolant until level of coolant is visible through sight glass.
(9)
Install coolant reservoir pressure cap.
c. Follow-On Maintenance.
(1)
Ensure radiator drain tap is secure.
(2)
Ensure no leaks are present on drain tap or radiator.
(3)
Ensure petcock on aftercooler housing is secure and no leaks are present.
(4)
Ensure coolant reservoir pressure cap is secured and tight.
(5)
(6)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Nose cone removed.
Cooling system drained.
Materials/Parts
Drawings Required
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Change 1