TM 5-2420-230-24-1
c. Follow-On Maintenance.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
END OF TASK
This Task Covers:
a. Removal
b. Repair
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Tool kit, automotive maintenance, common no. 2,
Parking brake applied.
FEL raised and maintenance
arm installed.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
"Do Not Operate" tag attached
to ignition switch.
Drawings Required
Personnel Required
Estimated Time to Complete Task
MOS 62B, Construction Equipment Repairer (2)
References
None
Change 1