TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
None
"Do Not Operate" tag attached
to ignition switch.
Personnel Required
MOS 62B, Construction Equipment Repairer
Drawings Required
References
None
Estimated Time to Complete Task
a. Removal.
(1)
Remove five bolts (1) and washers (2) from
hydraulic reservoir step plate (3).
(2)
Remove hydraulic reservoir step plate (3)
from hydraulic reservoir (4).
(3)
If required, remove battery trickle charger
b. Installation.
NOTE
If replacing step plate and vehicle has cold
modifications to hydraulic reservoir step
plate before proceeding.
(1)
If removed, install battery trickle charger
(2)
Place hydraulic reservoir step plate (3) on hydraulic reservoir (4), ensuring holes are aligned.
(3)
Install five washers (2) and bolts (1). Tighten bolts.
c. Follow-On Maintenance.
END OF TASK
Change 1